PT NUSA SOLAR is committed to creating a world-class solar product manufacturing base in Batam, Indonesia, it began construction in September 2023, entered mass production stage in august 2024, and annual production capacity is 3 GW.
The project utilizes the most advanced N-type technology, the design is compatible with the currently mainstream M10, G12T and G12R sizes, and is also upward-compatible with 230 mm size products.
The factory is equipped with Production MES system, intelligent factory brain system, AI-based security systems, AGV automatic transport vehicles, and industry-leading production lines, achieving comprehensive automation, informatization, and digitalized smart production and warehousing.
☑ Located ···